| Roadwork |
| Roadwork - Interstate 95 |
Interstate 95 northbound: from Exit 42 Payne Road to Exit 44 I-295 bridge construction — until November 30 last updated August 6 |
| |
| Roadwork - Interstate 95 |
Interstate 95 northbound: from Exit 52 Falmouth Spur to Exit 53 ME 26; ME 100 entrance ramp closed due to bridge construction work -- consider using an alternate route — until July 13, 2011 Comment: At Exit 52 in Falmouth the northbound entering ramp will be closed at 5am and remained closed for one year due to bridge construction at the Presumpscot River Bridge. Motorists should seek alternative routes. last updated July 30 |
| |
| Roadwork - Interstate 95 |
Interstate 95 northbound: at Exit 75 US 202 bridge maintenance operations, roadway reduced to one lane, speed restrictions in force — until September 17 last updated September 3 |
| |
| Roadwork - Interstate 95 |
Interstate 95 southbound: from Exit 80 ME 196 to Exit 86 ME 9 width limit in effect, traffic restrictions in force, roadway reduced to one lane due to bridge construction work Comment: Effective Tuesday November 17, 2009, because of bridge work on Route 196 there will be be a restriction for all wide loads on the Maine Turnpike as Follows: Such vehicles and loads southbound must depart at or Sabattus and may re-enter for southbound travel at Lewiston . This restriction will be in place until further notice. last updated November 10 |
| |
| Roadwork - Interstate 95 |
Interstate 95 in both directions: at Exit 80 ME 196 bridge construction, roadway reduced to one lane, speed restrictions in force Comment: At mile 81 .4 in Lewiston north and southbond lane closures are scheduled from 12am to further notice at the Rte 196 for bridge work. 50 mph work zone speed limits are in effect. last updated May 21 |
| |
| Roadwork - Interstate 95 |
Interstate 95 in both directions: from Exit 80 ME 196 to Lewiston Service Area bridge construction, roadway reduced to one lane, speed restrictions in force, width limit in effect Truck speed limit 50 MPH — until July 29, 2011 Comment: At mile 81.4 in Lewiston north and southbound lane closures are scheduled for major bridge rehabilitation 24 hours per day at the Rt 196 Bridge for bridge work. One lane will remain open in each direction through completion of the project in July of 2011. last updated May 21 |
| |
| Roadwork - Interstate 95 |
Interstate 95 in both directions: at Exit 80 ME 196 road maintenance operations, roadway reduced to one lane, speed restrictions in force — until November 15 Comment: At mile 85.2 in Sabattus north and southbound lane closures are scheduled through the project completion date on November 15, 2010 for bridge rehabilitation. 50 mph work zone speed limits are in effect. Please be alert for for workers and equipment within the work area. last updated May 21 |
| |
| Roadwork - Interstate 95 |
Interstate 95 in both directions: from Lewiston Service Area to Exit 86 ME 9 bridge construction, roadway reduced to one lane, speed restrictions in force, width limit in effect — until November 15 Comment: At mile 85.2 in Sabattus north and southbound lane closures are scheduled from 12am and will last 24 hours a day until completion of the project on November 15, 2010 for bridge rehabilitation. last updated May 21 |
| |
| Roadwork - Interstate 95 |
Interstate 95 southbound: between Exit 276 ME 159 and Exit 286 Smyrna Oakfield; River Road width limit in effect, roadway reduced to one lane because of bridge maintenance work Width limit 14 ' 0 " — until November 25 Comment: I -95 southbound in Oakfield reduced to one lane for Bridge Maintenance operations last updated May 13 |
| |
| Roadwork - Interstate 295 |
Interstate 295 southbound: from Exit 1 Maine Turnpike Approach to Exit 11 Falmouth Spur roadway reduced to one lane due to road work Advisory speed limit 55 MPH — until September 26 Comment: Audio Text: .Road Construction.. southbound.night work from 8pm to 6am.. last updated June 30 |
| |
| Roadwork - Interstate 295 |
Interstate 295 northbound: at Exit 11 Falmouth Spur roadway reduced to one lane, short delays due to road construction work Advisory speed limit 55 MPH from 08:00pm UTC -04:00 to 06:00am UTC -04:00 on weekdays — until September 26 Comment: Audio Text: Town of Scarbough,south Portland Falmouth Cumberland Reduced to one lane.. Northbound .. night work from 8 pm to 6am... last updated yesterday at 1:56 PM EDT |
| |
| Roadwork - Interstate 295 |
Interstate 295 northbound: between Exit 15 US 1 and Exit 17 US 1 roadway reduced to one lane because of bridge maintenance work Advisory speed limit 55 MPH — starting 9:00 PM, 09/10/10 until September 13 Comment: Audio Text: Alert!) I-295 northbound ....will be reduced to one lane at the Royal River Bridge in Yarmouth from 9PM Friday, Sept. 10 through 12Noon Monday, Sept. 13. SIGNIFICANT DELAYS ARE EXPECTED. Drivers should use alternate routes including the Maine Turnpike. from 9PM Friday, Sept. 10 through 12Noon Monday, Sept. 13. SIGNIFICANT DELAYS ARE EXPECTED. Drivers should use alternate routes including the Maine Turnpike. last updated yesterday at 1:54 PM EDT |
| |
| Roadwork - US 1A |
US 1A: at Winkumpaugh Road road construction due to road construction work — until May 31, 2011 Comment: Ellsworth. Construction on rte 1A in Ellsworth between Wickenpaugh Road and Red Bridge Road, expect daytime delays last updated May 14 |
| |
| Roadwork - US 1A |
US 1A: from Red Bridge Road to before ME 179; ME 180 road construction, delays of uncertain duration due to road construction work — until May 31, 2011 Comment: Ellsworth. Construction work on Route 1A Ellsworth from just north of Rte 180 toRed Bridge Road. Expect daytime delays. last updated July 29 |
| |
| Roadwork - US 1 |
US 1: from after ME 27 to before ME 32 single line traffic - alternating directions because the road is being repaved — until October 30 Comment: Audio Text: EDGECOMB TO NOBLEBORO, US 1.. last updated July 21 |
| |
| Roadwork - US 2 |
US 2: between ME 113 and ME 26; ME 5 single line traffic - alternating directions, temporary traffic lights due to bridge construction work — until November 18 Comment: Route: 2.....Gilead...Highway Reconstruction.....): This project includes removal of the existing bridge spanning over Bog Brook. The project begins 1.38 of a mile easterly of Bridge Street and extending easterly 1.95 miles. This project matches onto another active construction project .Full reconstruction to include clearing, utility pole relocation, rock excavation, drainage improvements, new subbase, new pavement, four precast concrete box culverts and other incidentals Traffic will be reduced to alternating one lane with the use of traffic signals from early/mid July through the end of August in the area of Bog Brook. The contractor will be removing the existing bridge and installing a precast concrete box culvert at Bog Brook . last updated September 6 |
| |
| Roadwork - US 2 |
US 2: from after ME 188; Dodlin Road to ME 155; High Street single line traffic - alternating directions due to night time construction work — until October 16 Comment: Flaggers will be directing alternating one way traffic, during the night time on Route 2 in Lincoln from the Access Road intersection 1.5 miles north towards Lincoln center. This is night work, two lanes of traffic will be maintained during the day. last updated August 16 |
| |
| Roadwork - US 2 |
US 2: from after ME 6; Lee Street to before Chester Road single line traffic - alternating directions because the road is being repaved — until October 16 Comment: Flaggers will be directing alternating one way traffic thru a construction zone on Route 2 in Lincoln from Evergreen Drive out 1.7 miles toward Winn. last updated August 16 |
| |
| Roadwork - US 2 |
US 2: between ME 158 and ME 159 bridge construction — until October 15, 2011 Comment: Audio Text: ISLAND FALLS...Bridge Replacement..... last updated May 17 |
| |
| Roadwork - US 201A |
US 201A: between US 2 and River Road, Sophie May Lane single line traffic - alternating directions because of bridge maintenance work — until November 30 Comment: Project # 634-2845 last updated August 26 |
| |
| Roadwork - US 201 |
US 201: between ME 196; New Lewiston and ME 138 single line traffic - alternating directions because of bridge maintenance work Width limit 16 ' 0 " — until October 29 Comment: Route 201 in Topsham at the Interstate Overpass Bridge and the Cathance River Bridge is reduced to one 16 foot lane with temporary traffic lights controlling alternating one way traffic. last updated June 17 |
| |
| Roadwork - US 201 |
US 201: between ME 196; New Lewiston and ME 138 single line traffic - alternating directions because of bridge maintenance work Width limit 16 ' 0 " — until October 29 Comment: Route 201 in Topsham at the Interstate Overpass Bridge and the Cathance River Bridge is reduced to one 16 foot lane with temporary traffic lights controlling alternating one way traffic last updated June 17 |
| |
| Roadwork - US 201 |
US 201: between US 202; Belfast Avenue and Hussey Hill Road roadway reduced to one lane, traffic restrictions in force because of bridge maintenance work Width limit 11 ' 0 " — until September 30 Comment: Route 201 in Augusta....Bridge Replacement Project....Riggs Brook in Augusta......... width of 11 feet through the construction site...Monday, November 30,.. ...approximately .3 miles north of the Route 201/Route 3 intersection on Route 201. ........Commercial vehicles will be restricted to a maximum allowable width of 11 feet through the construction site. Warning signs concerning the width restriction are posted on the approach to the construction site. last updated December 18 |
| |
| Roadwork - US 202 |
US 202: from ME 115; Windham Rd to before I-95 Turnpike road construction Comment: Audio Text: Town : Gray - Windham..Route :202-115.Intersection Reconstruction last updated February 8 |
| |
| Roadwork |
Falmouth Spur: from I-95 Turnpike to Falmouth Toll Plaza bridge maintenance operations, roadway reduced to one lane, speed restrictions in force -- eastbound traffic, westbound traffic — until November 26 Comment: At Exit 52 in Falmouth on the Falmouth Spur east and westbound permanent lane closures are in place at the Blackstrap and Maine Central Railroad Bridges for for bridge rehabilitation. The ongoing work is scheduled to be completed early in 2011. 35 mph work zone speed limits are in effect. last updated July 28 |